Baan Suan Mok
Baan Suan Mok
Residential Resort in Hua Hin
|
| Developers: TH-property Estate Agents Co. Ltd. |
|
Home at Baan Suan Mok
The houses are finished with a rustic exterior and modern western-influenced interior with fully fitted kitchens and bathrooms of excellent quality. A private spa and swimming pool just off your master bedroom porch is an optional extra very much worth considering. The cottage plots all measure 500m² and the villa has the largest plot of 988m². Each house is supplied with 3-phase electricity via underground cables from our own transformer. Water is supplied by the local water authority and stored in 8,000 litre underground water tanks at each house. Telephone and ADSL internet connections are also made ready for subscription. Long shaded terrace, big living room, 3 bedrooms and 2 bathrooms all ensuite, natural wood cabinets and granite worktops, kitchen and bathrooms handmade to order, store/utilty room, 135 m² in all, plus the carport. The pilot house has been built with the help of local labour and tradesmen under the supervision of the now resident developer, and has served as a very good prototype. The floorplan and construction method has been greatly improved and building of the next three cottages is now underway. Our concept evisions a rather exclusive little cul-de-sac of particular beauty and charm with much tropical foliage and watery landscaping This project is owned entirely by TH-property Estate Agents Co. Ltd., one of Hua Hin's excellent real estate brokerages. You are welcome to call or visit us at Baan Suan Mok. "Suan" is Thai for garden, and "Mok" - don Mok - is the Jasmin tree with which we are cultivating hedgerows all round the property.
TH-Property
Estate Agents Co. Ltd. Baan Suan Mok, 81 Moo 1, Hua Hin Nong Plub Road, Hin Lek Fai, 77110 Hua Hin, Thailand. Tel/fax: 032 57 51 82 Mobile(EN): 081 98 101 92 Mobile(TH): 081 98 12 764
www.th-property.com
Houses for sale Hua Hin |
These photos show the second phase of the development - the building of the first of three cottages for sale. The most recent photos are at the bottom. Click the images for the larger view. Excavations for the foundation footings, lined with 20 cms of concrete. |
|
|
Steelwork for the padstones and the foundation pillars |
|
|
|
Padstones are 25 cms thick and 120 cms wide, reinforced with 16 mm steel
|
|
|
|
Rebar for the ground beams tied into the rebar for the pillars
|
|
|
|
Shuttering in place, ready to pour the concrete for the ground beams
|
|
|
|
Ground beams completed
|
|
|
|
Pouring 12 cms of concrete on top of the floor slabs
|
|
|
|
The pillars are cast. All are 15 cm square, except the two on the patio which are 20 cms round. |
|
|
|
The welding team starting on the roof frame.
|
|
|
|
Start of the wall block work. This is the 14 cm "big cavity block" for enhanced insulation. |
|
|
|
The roof and the walls taking shape
|
|
|
|
It took 6 men 5 days to complete the roof construction
|
|
|
|
... and they did very good job too. All the welds will now be cleaned and the whole construction repainted. |
|
|
|
The roof tiling takes five days to complete ...
|
|
|
|
All done except the copings, and this roof looks very nice indeed!
|
|
|
|
Today they started on the carport roof
|
|
|
|
Ridge irons for the coping tiles
|
|
|
|
Routing and conduits for the electrical system
|
|
|
|
The kitchen archway
|
|
|
|
The roof is now complete and the facia board is mounted
|
|
|
|
Internal rendering finished and suspended ceiling work started
|
|
|
|
External rendering and decorative stone work in progress
|
|
|
|
Septic tank and soakaway system for the second bathroom. There's another behind the house for the master bathroom and kitchen. |
|
|
|
Gypsum board ceiling work in progress. These boards have a reflective aluminium foil back for heat insulation. |
|
|
|
8,000 litre underground freshwater tank under construction. |
|
|
|
You can see it's a double-wall steel-reinforced construction, similar to the way swimming pools are built. |
|
|
|
Internal wall plastering in progress. This work gives a very smooth surface, much better than the standard concrete render. |
|
|
|
Adding the finishing touches to the stepped ceilings. |
|
|
|
The water storage tank now has a smooth, rubberized concrete render |
|
|
|
Plumbing first fix and pouring the bathroom floors |
|
|
|
The master bathroom starts to take shape |
|
|
|
... and the second bathroom too |
|
|
|
The first coat of anti-fungal primer paint |
|
|
|
The door and window frames arrive. |
|
|
|
The first coat of surface paint applied |
|
|
|
Door and window frames mounted |
|
|
|
Tiling of the living room and bedrooms underway |
|
|
|
and the bathrooms too |
|
|
|
Preparation of the 50m road and the driveway to plot 2. |
|
|
|
The roadway is now sanded, compacted, and the steel is in place |
|
|
|
Pouring and spreading the concrete at the plot 2 end of the road |
|
|
|
Pouring and spreading the concrete at the entrance to Baan Suan Mok |
|
|
|
And smoothing the road surface |
|
|
|
The furniture maker installing the windows |
|
|
|
Drilling a hole for the transformer post |
|
|
|
Erecting the post |
|
|
|
Now ready for the transformer and connection to the grid |
|
|
|
Bath installed in the mater bathroom, now ready for the granite tops |
|
|
|
Bathroom two tiled completely and now ready for granite |
|
|
|
The doors are looking very good. We've chosen the lightest Thai redwood we can find and given it a light teak stain and polish. |
|
|
|
The windows are of the same wood, with brass fittings. |
|
|
|
Fitting the glass |
|
|
|
Fitting the skirting boards |
|
|
|
Granite counter tops and sanitary ware fitted |
|
|
|
The chief furniture maker preparing the window sills for stain |
|
|
|
and the beautiful, shining result |
|
|
|
Underground cables for electricty and telephone being protected with a three inch layer of concrete. |
|
|
|
Mounting the 3-phase connection and meter cabinet beside the transformer
|
|
|
|
Building the fitted kitchen
|
|
|
|
Woodwork now all done, ready for staining and polishing
|
|
|
|
Connecting the transformer
|
|
|
|
The retaining wall and concrete posts for the pickett fence
|
|
|
|
Granite work tops now fitted in the kitchen.
|
|
|